Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 224546,  Location: IN MIDTOWN MANHATTAN (Lat: 40.754125,  Lng: -73.976525),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 11,500 (year 1976),  Features Intersected: EAST 45TH STREET,  Facility Carried by Structure: PARK AVENUE SB
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 224547,  Location: IN MIDTOWN MANHATTAN (Lat: 40.753819,  Lng: -73.975808),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 11,500 (year 1976),  Features Intersected: EAST 45TH STREET,  Facility Carried by Structure: PARK AVENUE NB
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 224548,  Location: S OF GEORGE WASHINGTON BR (Lat: 40.845056,  Lng: -73.943800),  Route carried "under" structure: City street ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 12,880 (year 2021),  Features Intersected: RIVERSIDE DRIVE,  Facility Carried by Structure: TO GWB OPP 171 ST
Minimum Vertical Clearance: 9.90m (32.48ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 224609,  Location: S END OF CENTRAL PARK (Lat: 40.769247,  Lng: -73.973617),  Route carried "under" structure: City street ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 36,600 (year 1970),  Features Intersected: TRANSVERSE RD 1,  Facility Carried by Structure: PED BRDG OPP 65ST
Minimum Vertical Clearance: 4.16m (13.65ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 22461,  Location: IN CENTRAL PARK (Lat: 40.769764,  Lng: -73.974508),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 36,600 (year 1970),  Features Intersected: TRANSV RD NO 1,  Facility Carried by Structure: CENTRAL DRIVE
Minimum Vertical Clearance: 3.51m (11.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 224611,  Location: SE END OF CENTRAL PARK (Lat: 40.768997,  Lng: -73.972894),  Route carried "under" structure: City street ,  Year Built: 1905,  Structure Length: 0. m,  Average Daily Traffic: 36,600 (year 1970),  Features Intersected: 65TH ST TRANSVERS,  Facility Carried by Structure: EAST DRIVE
Minimum Vertical Clearance: 3.81m (12.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 224612,  Location: SW END OF CENTRAL PARK (Lat: 40.771508,  Lng: -73.977389),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 36,600 (year 1970),  Features Intersected: TRANSVERSE RD 1,  Facility Carried by Structure: WEST DRIVE
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 224623,  Location: IN CENTRAL PARK (Lat: 40.778192,  Lng: -73.966489),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 18,800 (year 2021),  Features Intersected: 79TH ST TRANSVERSE,  Facility Carried by Structure: EAST DRIVE
Minimum Vertical Clearance: 3.71m (12.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 224624,  Location: IN CENTRAL PARK (Lat: 40.779931,  Lng: -73.971028),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 18,800 (year 2021),  Features Intersected: 79TH ST TRANSVERS,  Facility Carried by Structure: WEST DRIVE
Minimum Vertical Clearance: 3.40m (11.15ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 224625,  Location: E END OF CENTRAL PARK (Lat: 40.781589,  Lng: -73.962819),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 20,400 (year 1969),  Features Intersected: TRANSV RD NO 3N,  Facility Carried by Structure: EAST DRIVE
Minimum Vertical Clearance: 3.66m (12.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 11.8m (38.7ft)

Find on map >>   Show street view

Structure Number: 224626,  Location: IN CENTRAL PARK (Lat: 40.784436,  Lng: -73.967194),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 20,400 (year 1969),  Features Intersected: 86TH ST TRANSVERS,  Facility Carried by Structure: WEST DRIVE
Minimum Vertical Clearance: 3.84m (12.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 224627,  Location: IN CENTRAL PARK (Lat: 40.789467,  Lng: -73.957394),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2021),  Features Intersected: 97TH ST TRANSVERS,  Facility Carried by Structure: EAST DRIVE
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 224628,  Location: IN CENTRAL PARK (Lat: 40.791636,  Lng: -73.962536),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2021),  Features Intersected: 97TH ST TRANSVERS,  Facility Carried by Structure: WEST DRIVE
Minimum Vertical Clearance: 4.01m (13.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 22464,  Location: IN CENTRAL PARK (Lat: 40.777814,  Lng: -73.964931),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 18,800 (year 2021),  Features Intersected: TRANSVERSE RD NO2,  Facility Carried by Structure: FTBG ON EAST SIDE
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 224644,  Location: IN CENTRAL PARK (Lat: 40.778833,  Lng: -73.968344),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 18,800 (year 2021),  Features Intersected: TRANSVERSE RD NO2,  Facility Carried by Structure: PED IN CTR OF PK
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Length of Maximum Span: 12.4m (40.7ft)

Find on map >>   Show street view

Structure Number: 2246489,  Location: AT WASHINGTON HEIGHTS (Lat: 40.848033,  Lng: -73.930597),  Route carried "under" structure: City street ,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 2,200 (year 2021),  Features Intersected: RAMP FROM WASH BR,  Facility Carried by Structure: WEST 181ST STREET
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 224649,  Location: IN HARLEM (Lat: 40.827094,  Lng: -73.935150),  Route carried "under" structure: Business City street ,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 16,600 (year 1967),  Features Intersected: WILLIE MAYS DRIVE,  Facility Carried by Structure: A.C.POWEL BLVD NB
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 22465,  Location: IN FORT TRYON PARK (Lat: 40.862931,  Lng: -73.932744),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2021),  Features Intersected: ENT FM RVRSIDE DR,  Facility Carried by Structure: FORT TRYON PLACE
Minimum Vertical Clearance: 10.99m (36.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 224651,  Location: AT FORT TRYON PARK (Lat: 40.863878,  Lng: -73.931825),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2021),  Features Intersected: M.CORBIN DRIVE,  Facility Carried by Structure: CORBIN DRIVE OVPS
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 224655,  Location: MIDTOWN MANHATTAN (Lat: 40.752111,  Lng: -73.977647),  Route carried "under" structure: City street ,  Year Built: 1917,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 1969),  Features Intersected: 42ND STREET, 41ST STREET,  Facility Carried by Structure: PARK AVE. VIADUCT
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 68.3m (224.1ft)

Find on map >>   Show street view

Structure Number: 224656,  Location: IN MANHATTAN (Lat: 40.749128,  Lng: -73.970597),  Route carried "under" structure: City street ,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 1969),  Features Intersected: EAST 42ND STREET,  Facility Carried by Structure: TUDOR CITY PLACE
Minimum Vertical Clearance: 7.95m (26.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 31.6m (103.7ft)

Find on map >>   Show street view

Structure Number: 224658,  Location: IN HIGH BRIDGE PK (Lat: 40.842133,  Lng: -73.928256),  Route carried "under" structure: Interstate 87,  Year Built: 1926,  Structure Length: 0. m,  Average Daily Traffic: 147,078 (year 1999),  Features Intersected: RTE I87, HARLEM RIVER&HR,  Facility Carried by Structure: HIGH BRIDGE PDOVP
Minimum Vertical Clearance: 12.99m (42.62ft),  Kilometerpoint: 5.519,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Arch - Deck,  Length of Maximum Span: 136.5m (447.8ft)

Find on map >>   Show street view

Structure Number: 22466,  Location: IN NW MANHATTAN (Lat: 40.847656,  Lng: -73.942589),  Route carried "under" structure: City street ,  Year Built: 1933,  Structure Length: 0. m,  Average Daily Traffic: 3,700 (year 2021),  Features Intersected: APPROACH TO GWB,  Facility Carried by Structure: W.176TH ST PEDOVP
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 22.8m (74.8ft)

Find on map >>   Show street view

Structure Number: 224662,  Location: AT HARLEM (Lat: 40.805722,  Lng: -73.934483),  Route carried "under" structure: City street ,  Year Built: 1945,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 1970),  Features Intersected: E.128TH STREET, 3RD AVE,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 0.000,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.0m (101.7ft)

Find on map >>   Show street view

Structure Number: 224666,  Location: OVER ST CLAIR PL-TO 134ST (Lat: 40.817986,  Lng: -73.960381),  Route carried "under" structure: City street ,  Year Built: 1897,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 1970),  Features Intersected: W125 ST, 12TH AVENUE, St,  Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 224671,  Location: AT HARLEM (Lat: 40.826683,  Lng: -73.935369),  Route carried "under" structure: City street ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 31,800 (year 1967),  Features Intersected: WILLIE MAYS DRIVE,  Facility Carried by Structure: WEST 153RD STREET
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 224672,  Location: IN NW MANHATTAN (Lat: 40.836442,  Lng: -73.948517),  Route carried "under" structure: City street ,  Year Built: 1927,  Structure Length: 0. m,  Average Daily Traffic: 6,509 (year 2015),  Features Intersected: WEST 158TH STREET, AMTRA,  Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 8.79m (28.84ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 224674,  Location: 0.8MI N OF JCT FDRD&NYS25 (Lat: 40.767439,  Lng: -73.950144),  Route carried "under" structure: City street 907L,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 65,900 (year 1973),  Features Intersected: RTE 907L,  Facility Carried by Structure: CON ED AT E75 ST
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 224686,  Location: IN LOWER MANHATTAN (Lat: 40.709089,  Lng: -74.012594),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2021),  Features Intersected: THAMES STREET,  Facility Carried by Structure: NYU PEDSTRN BRDG
Minimum Vertical Clearance: 23.99m (78.71ft),  Kilometerpoint: 0.000,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 6.4m (21.0ft)

Find on map >>   Show street view

Structure Number: 224697,  Location: IN WEST MANHATTAN (Lat: 40.796008,  Lng: -73.975008),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2021),  Features Intersected: WEST 96TH STREET,  Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Arch - Deck,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 224698,  Location: WEST MANHATTAN (Lat: 40.822903,  Lng: -73.955769),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 700 (year 2021),  Features Intersected: W.138TH STREET,  Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 224699,  Location: AT HARLEM (Lat: 40.807042,  Lng: -73.935189),  Route carried "under" structure: Ramp City street ,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 26,900 (year 2021),  Features Intersected: RAMP OFF 3RD AVE,  Facility Carried by Structure: FB BET 129&130 ST
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 224757,  Location: IN GLENDALE (Lat: 40.707103,  Lng: -73.869106),  Route carried "under" structure: City street ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 1,700 (year 2021),  Features Intersected: 77TH AVE., LONG ISLAND R,  Facility Carried by Structure: 80TH ST
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 2248019,  Location: IN WOODHAVEN (Lat: 40.688100,  Lng: -73.848711),  Route carried "under" structure: City street ,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2011),  Features Intersected: ATLANTIC AVENUE,  Facility Carried by Structure: WOODHAVEN BLVD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.7m (100.7ft)

Find on map >>   Show street view

Structure Number: 224802,  Location: 2.5 MI W JCT I678 & NY27 (Lat: 40.670258,  Lng: -73.846942),  Route carried "under" structure: State highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2021),  Features Intersected: CONDUIT BOULEVARD,  Facility Carried by Structure: PED AT WHITELAW
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 2248039,  Location: 0.2 NW OF RTE 27 & BSOP (Lat: 40.668694,  Lng: -73.842158),  Route carried "under" structure: City street 27,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 69,164 (year 1999),  Features Intersected: RTE 27, 27 X Nassau Expw,  Facility Carried by Structure: CROSS BAY BLVD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.901,  Lanes on structure: 9,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 2248039,  Location: 0.2 NW OF RTE 27 & BSOP (Lat: 40.668694,  Lng: -73.842158),  Route carried "under" structure: City street ,  Year Built: 1949,  Structure Length: 0. m,  Features Intersected: RTE 27, 27 X Nassau Expw,  Facility Carried by Structure: CROSS BAY BLVD
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.901,  Lanes on structure: 9,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 224804,  Location: AT NEW LOTS (Lat: 40.671628,  Lng: -73.852897),  Route carried "under" structure: City street ,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2021),  Features Intersected: SOUTH CONDUIT AVE,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 2248059,  Location: AT FRESH MEADOWS (Lat: 40.733306,  Lng: -73.771278),  Route carried "under" structure: City street ,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 14,400 (year 1974),  Features Intersected: FRANCIS LEWIS BLD,  Facility Carried by Structure: MOTOR PKWY (PED)
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 224806,  Location: AT OAKLAND GARDENS (Lat: 40.736583,  Lng: -73.756214),  Route carried "under" structure: City street ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,800 (year 1969),  Features Intersected: BELL BLVD,  Facility Carried by Structure: MOTOR PKWY (PED)
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 224807,  Location: AT OAKLAND GARDENS (Lat: 40.737978,  Lng: -73.748339),  Route carried "under" structure: City street ,  Year Built: 1924,  Structure Length: 0. m,  Average Daily Traffic: 11,800 (year 1973),  Features Intersected: SPRINGFIELD BLVD,  Facility Carried by Structure: MOTOR PKWY (PED)
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 224808,  Location: W END OF CUNNINGHAM PARK (Lat: 40.734569,  Lng: -73.765114),  Route carried "under" structure: City street ,  Year Built: 1925,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2021),  Features Intersected: HOLLIS COURT BLVD,  Facility Carried by Structure: MOTOR PKWY (PED)
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 224809,  Location: AT FLUSHING MEADOW PARK (Lat: 40.749300,  Lng: -73.832694),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 18,700 (year 1977),  Features Intersected: LAWRENCE STREET,  Facility Carried by Structure: FLSHG MDW PK PED.
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 22481,  Location: W END OF CUNNINGHAM PARK (Lat: 40.736139,  Lng: -73.773297),  Route carried "under" structure: City street ,  Year Built: 1926,  Structure Length: 0. m,  Average Daily Traffic: 8,219 (year 2018),  Truck Traffic: 5%,  Features Intersected: 73RD AVE,  Facility Carried by Structure: MOTOR PKWY (PED)
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 4.425,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 2248129,  Location: .1 MI W BCIP & UNION TPKE (Lat: 40.740675,  Lng: -73.728258),  Route carried "under" structure: State lands road ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2021),  Features Intersected: CREEDMOOR HOSP RD,  Facility Carried by Structure: UNION TURNPIKE
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 7.9m (25.9ft)

Find on map >>   Show street view

Structure Number: 2248159,  Location: .1 MI W JCT SH 25 & I495 (Lat: 40.733469,  Lng: -73.870497),  Route carried "under" structure: State highway ,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 39,800 (year 1975),  Features Intersected: QUEENS BLVD W/B, QUEENS,  Facility Carried by Structure: WOODHAVEN BLVD
Minimum Vertical Clearance: 4.03m (13.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.6m (34.8ft)

Find on map >>   Show street view

Structure Number: 224816,  Location: UNDER INT NY 25 & I 495 (Lat: 40.732558,  Lng: -73.868131),  Route carried "under" structure: State highway ,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 39,800 (year 1975),  Features Intersected: QUEENS BLVD, RTE I495, Q,  Facility Carried by Structure: ELIOT AVENUE
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 13.017,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.6m (34.8ft)

Find on map >>   Show street view

Structure Number: 224819,  Location: AT AQUEDUCT RACE TRACK (Lat: 40.666664,  Lng: -73.832908),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 1973),  Features Intersected: North Conduit Ave,  Facility Carried by Structure: AQUEDUCT PRV ROAD
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 22482,  Location: AT MASPETH (Lat: 40.717800,  Lng: -73.909686),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 14,500 (year 1968),  Features Intersected: FLUSHING AVENUE,  Facility Carried by Structure: RUST STREET
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 224822,  Location: AT MASPETH (Lat: 40.717556,  Lng: -73.909989),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 14,500 (year 1968),  Features Intersected: FLUSHING AVENUE,  Facility Carried by Structure: FLUSH AVE SERVICE
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 224823,  Location: IN JACOB RIIS PARK (Lat: 40.571336,  Lng: -73.869339),  Route carried "under" structure: City street ,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 1974),  Features Intersected: BEACH CHAN DR EB,  Facility Carried by Structure: BEACH CHAN DR WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 224824,  Location: AT MASPETH (Lat: 40.716567,  Lng: -73.911303),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 9,700 (year 2021),  Features Intersected: FLUSHING AVENUE,  Facility Carried by Structure: SERVICE ROAD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 2248299,  Location: AT FORREST HILLS (Lat: 40.712917,  Lng: -73.833567),  Route carried "under" structure: Business City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1971),  Features Intersected: AUSTIN STREET,  Facility Carried by Structure: RTE 908B
Minimum Vertical Clearance: 4.22m (13.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 22483,  Location: AT GLENDALE (Lat: 40.706950,  Lng: -73.874644),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 8,700 (year 1967),  Features Intersected: COOPER AVENUE,  Facility Carried by Structure: 71ST AVENUE
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 31.3m (102.7ft)

Find on map >>   Show street view

Structure Number: 224834,  Location: IN FOREST PARK (Lat: 40.702089,  Lng: -73.850689),  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 1976),  Features Intersected: MYRTLE AVENUE,  Facility Carried by Structure: FOREST PARK DRIVE
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 224951,  Location: 1 MI NW OF VERZ - NAR BRG (Lat: 40.616906,  Lng: -74.074517),  Route carried "under" structure: City street ,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1990),  Features Intersected: WILLOW AVENUE, SIRT SOUT,  Facility Carried by Structure: TOMPKINS AVENUE
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 224953,  Location: IN TOMPKINSVILLE (Lat: 40.637647,  Lng: -74.074989),  Route carried "under" structure: City street ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2021),  Features Intersected: MINTHORNE STREET, SIRT S,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 12.4m (40.7ft)

Find on map >>   Show street view

Structure Number: 224984,  Location: AT CLIFTON (Lat: 40.617428,  Lng: -74.074883),  Route carried "under" structure: City street ,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2000),  Features Intersected: GREENFIELD AVENUE,  Facility Carried by Structure: TOMPKINS AVENUE
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 2257569,  Location: WEST SIDE HIGHWAY-W 59 ST (Lat: 40.772903,  Lng: -73.993506),  Route carried "under" structure: City street ,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2021),  Features Intersected: 59TH STREET, RELIEF,  Facility Carried by Structure: RTE 9A
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 2266129,  Location: .2 MI SE JCT GCP & CIP (Lat: 40.745436,  Lng: -73.734975),  Route carried "under" structure: State highway 907A,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 48,950 (year 1970),  Features Intersected: RTE 907A,  Facility Carried by Structure: DOUGLASTON PKWY
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 20.595,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 2266139,  Location: .2 MI NE JCT GCP & CIP (Lat: 40.745761,  Lng: -73.735100),  Route carried "under" structure: City street 907A,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 48,950 (year 1970),  Features Intersected: RTE 907A,  Facility Carried by Structure: DOUGLASTON PKWY
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 20.595,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 2266149,  Location: .5 MI E JCT CIP & SH 24 (Lat: 40.710903,  Lng: -73.727511),  Route carried "under" structure: Ramp City street 907A,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 2021),  Features Intersected: RTE 907A,  Facility Carried by Structure: RTE 24
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 5.1m (16.7ft)

Find on map >>   Show street view

Structure Number: 226616,  Location: JCT OF I678 & CRS ISL PKW (Lat: 40.789567,  Lng: -73.822533),  Route carried "under" structure: Interstate 678,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 140,410 (year 2008),  Features Intersected: Cross Island Parkway NB,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.446,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 226616,  Location: JCT OF I678 & CRS ISL PKW (Lat: 40.789567,  Lng: -73.822533),  Route carried "under" structure: City street 907A,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 33,900 (year 1970),  Features Intersected: Cross Island Parkway NB,,  Facility Carried by Structure: RTE I678
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 30.410,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 226616,  Location: JCT OF I678 & CRS ISL PKW (Lat: 40.789567,  Lng: -73.822533),  Route carried "under" structure: City street ,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 33,900 (year 1970),  Features Intersected: Cross Island Parkway NB,,  Facility Carried by Structure: RTE I678
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 30.410,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 226654,  Location: JCT.MDE & BE (Lat: 40.803150,  Lng: -73.916939),  Route carried "under" structure: Interstate ,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 1977),  Features Intersected: BRUCKNER BLVD (EB), FROM,  Facility Carried by Structure: RTE I278
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.531,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.6m (34.8ft)

Find on map >>   Show street view

Structure Number: 226663,  Location: EAST 48TH ST & FDR DRIVE (Lat: 40.751814,  Lng: -73.965056),  Route carried "under" structure: Other road 907L,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2021),  Features Intersected: RTE 907L, Ent to UN Plaz
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 9.010,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>   Show street view

Structure Number: 226663,  Location: EAST 48TH ST & FDR DRIVE (Lat: 40.751814,  Lng: -73.965056),  Route carried "under" structure: Other road ,  Year Built: 1998,  Structure Length: 0. m,  Features Intersected: RTE 907L, Ent to UN Plaz,  Facility Carried by Structure: RTE 907L
Minimum Vertical Clearance: 4.22m (13.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>   Show street view

Structure Number: 226677,  Location: JCT CRS IS PKWY & LAUR PK (Lat: 40.687294,  Lng: -73.725036),  Route carried "under" structure: City street 908M,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 122,000 (year 2021),  Features Intersected: 908M908M03012002, RTE 90,  Facility Carried by Structure: RTE 907A
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 226716,  Location: .4 MI S GCP & 678I (Lat: 40.752956,  Lng: -73.851178),  Route carried "under" structure: Other road ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2021),  Features Intersected: PARK ROAD N/B, NYCTA FLU,  Facility Carried by Structure: ROOSEVELT AVENUE
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.3m (33.8ft)

Find on map >>   Show street view

Structure Number: 2267199,  Location: OVER CUNNINGHAM PARK ROAD (Lat: 40.729119,  Lng: -73.768289),  Route carried "under" structure: Other road ,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Features Intersected: PARK ROAD E/B, PARK ROAD,  Facility Carried by Structure: FRANCIS LEWIS BVD
Minimum Vertical Clearance: 3.28m (10.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 226724,  Location: RAMP HRD TO TMX (Lat: 40.845797,  Lng: -73.930589),  Route carried "under" structure: City street 907P,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2021),  Features Intersected: HIGH BRIDGE, RTE 907P, R
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 4.988,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 17.0m (55.8ft)

Find on map >>   Show street view

Structure Number: 226724,  Location: RAMP HRD TO TMX (Lat: 40.845797,  Lng: -73.930589),  Route carried "under" structure: Ramp City street ,  Year Built: 1939,  Structure Length: 0. m,  Features Intersected: HIGH BRIDGE, RTE 907P, R,  Facility Carried by Structure: RAMP907PXMR07B1
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 17.0m (55.8ft)

Find on map >>   Show street view

Structure Number: 226738,  Location: ON & OFF RAMP TO BBT (Lat: 40.706764,  Lng: -74.014586),  Route carried "under" structure: City street ,  Year Built: 1946,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2021),  Features Intersected: ON RAMP TO BBT,  Facility Carried by Structure: MANHATTAN PLAZA
Minimum Vertical Clearance: 4.17m (13.68ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 9.7m (31.8ft)

Find on map >>   Show street view

Structure Number: 2267718,  Location: 79 ST BOAT BASIN (Lat: 40.785878,  Lng: -73.984386),  Route carried "under" structure: ServiceCity street ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Features Intersected: 79ST BT BASIN GRG, 79 ST,  Facility Carried by Structure: 79TH ST TRFIC CRL
Minimum Vertical Clearance: 2.89m (9.48ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 7.9m (25.9ft)

Find on map >>   Show street view

Structure Number: 226771B,  Location: 79 ST RAMP TO BOAT BASIN (Lat: 40.785575,  Lng: -73.984978),  Route carried "under" structure: ServiceCity street ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Features Intersected: RAMP TO SB HH PKY, 79ST,  Facility Carried by Structure: 79 ST RAMP TO GAR
Minimum Vertical Clearance: 2.89m (9.48ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.5m (27.9ft)

Find on map >>   Show street view

Structure Number: 226771C,  Location: 79 ST BOAT BASIN (Lat: 40.786100,  Lng: -73.984597),  Route carried "under" structure: ServiceCity street ,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Features Intersected: SB HHP RAMP TO 79, 79ST,  Facility Carried by Structure: GARAGE RAMP TO 79
Minimum Vertical Clearance: 2.92m (9.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.5m (27.9ft)

Find on map >>   Show street view

Structure Number: 226835,  Location: ADJACENT TO COLUMBIA HGTS (Lat: 40.693433,  Lng: -73.999578),  Route carried "under" structure: Interstate ,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 50,350 (year 1977),  Features Intersected: BQE SOUTHBOUND,  Facility Carried by Structure: BRKLYN PROMENADE
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>   Show street view

Structure Number: 2268361,  Location: GCP SERV RD WB&PARSONS BD (Lat: 40.716247,  Lng: -73.803978),  Route carried "under" structure: Other road 907M,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 47,850 (year 1970),  Features Intersected: RTE 907M,  Facility Carried by Structure: GCP SERVICE RD-WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 2268362,  Location: GCP SERV RD EB&PARSONS BD (Lat: 40.715908,  Lng: -73.803914),  Route carried "under" structure: Other road 907M,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 47,850 (year 1970),  Features Intersected: RTE 907M,  Facility Carried by Structure: GCP SERVICE RD-EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.320,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 226848,  Location: CHAMBERS ST AT WEST ST (Lat: 40.717494,  Lng: -74.012964),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 53,100 (year 1991),  Features Intersected: 9A WEST STREET,  Facility Carried by Structure: AT STUYVESANT SCH
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 4.666,  Lanes under structure: 10,  Material/Design: Steel,  Design/Construction: Arch - Thru,  Length of Maximum Span: 70.1m (230.0ft)

Find on map >>   Show street view

Structure Number: 2268497,  Location: ADJACENT TO FURMAN STREET (Lat: 40.700128,  Lng: -73.996000),  Route carried "under" structure: Interstate 278,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 202,650 (year 2002),  Features Intersected: RTE I278, FURMAN STREET,
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>   Show street view

Structure Number: 2268497,  Location: ADJACENT TO FURMAN STREET (Lat: 40.700128,  Lng: -73.996000),  Route carried "under" structure: City street ,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 2,030 (year 1971),  Features Intersected: RTE I278, FURMAN STREET,,  Facility Carried by Structure: RTE I278
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>   Show street view

Structure Number: 2268498,  Location: ADJACENT TO FURMAN STREET (Lat: 40.700114,  Lng: -73.995911),  Route carried "under" structure: Interstate 278,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 202,650 (year 2002),  Features Intersected: RTE I278, BRKLYN PROMENA
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 12.068,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 29.5m (96.8ft)

Find on map >>   Show street view

Structure Number: 2268507,  Location: ADJACENT TO YORK STREET (Lat: 40.701650,  Lng: -73.990389),  Route carried "under" structure: Interstate 278,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 122,522 (year 2002),  Features Intersected: RTE I278, YORK STREET
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 13.355,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 2268507,  Location: ADJACENT TO YORK STREET (Lat: 40.701650,  Lng: -73.990389),  Route carried "under" structure: City street ,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 2,030 (year 1971),  Features Intersected: RTE I278, YORK STREET,  Facility Carried by Structure: RTE I278
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 2268508,  Location: ADJACENT TO YORK STREET (Lat: 40.701583,  Lng: -73.990508),  Route carried "under" structure: Interstate 278,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 122,522 (year 2002),  Features Intersected: RTE I278, BROOKLYN BRIDG
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 13.146,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 16.1m (52.8ft)

Find on map >>   Show street view

Structure Number: 2268517,  Location: ADJACENT TO FURMAN STREET (Lat: 40.702400,  Lng: -73.992439),  Route carried "under" structure: Interstate 278,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 202,650 (year 2002),  Features Intersected: RTE I278, FURMAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 2268517,  Location: ADJACENT TO FURMAN STREET (Lat: 40.702400,  Lng: -73.992439),  Route carried "under" structure: City street ,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 2,030 (year 1971),  Features Intersected: RTE I278, FURMAN STREET,  Facility Carried by Structure: RTE I278
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 2268518,  Location: ADJACENT TO FURMAN STREET (Lat: 40.702478,  Lng: -73.992350),  Route carried "under" structure: Interstate 278,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 202,650 (year 2002),  Features Intersected: RTE I278, FURMAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 2268518,  Location: ADJACENT TO FURMAN STREET (Lat: 40.702478,  Lng: -73.992350),  Route carried "under" structure: City street ,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 2,030 (year 1971),  Features Intersected: RTE I278, FURMAN STREET,  Facility Carried by Structure: RTE I278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 226893,  Location: Morris Street Over I-478 (Lat: 40.706192,  Lng: -74.014842),  Route carried "under" structure: City street ,  Year Built: 2017,  Structure Length: 0. m,  Features Intersected: I-478,  Facility Carried by Structure: Morris Street
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: 226903,  Location: AT UNIVERSITY HEIGHTS (Lat: 40.853211,  Lng: -73.920925),  Route carried "under" structure: ServiceCity street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Features Intersected: MAC CRACKEN AVE,  Facility Carried by Structure: MATTHEWSON ROAD
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 7.6m (24.9ft)

Find on map >>   Show street view

Structure Number: 226924,  Location: RIVERSIDE DRIVE (Lat: 40.834094,  Lng: -73.949067),  Route carried "under" structure: City street ,  Year Built: 1908,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2021),  Features Intersected: WEST 155TH STREET,  Facility Carried by Structure: RIVERSIDE DRIVE
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 22696,  Location: ERSKINE ST OVER SHORE PKY (Lat: 40.651539,  Lng: -73.865578),  Route carried "under" structure: Alternate State highway ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 32,566 (year 2002),  Features Intersected: 9076907CSHORE PKY EB, 90,  Facility Carried by Structure: ERSKINE STREET
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Discuss New York, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.