Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,992Number of bridges
- 68,865ft / 20,990mTotal length
- $41,847,025,000Total costs
- 106,047,317Total average daily traffic
- 3,057,321Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for New York
- No street view available for this location
- New bridges - historical statistics
- 47Before 1900
- 1961900-1909
- 1711910-1919
- 1241920-1929
- 3951930-1939
- 2541940-1949
- 4641950-1959
- 7351960-1969
- 1551970-1979
- 881980-1989
- 731990-1999
- 1432000-2009
- 1242010-2019
- 232020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 121930-1939
- 01940-1949
- 71950-1959
- 81960-1969
- 491970-1979
- 1441980-1989
- 1731990-1999
- 982000-2009
- 652010-2019
- 52020-2022
- Bridge Condition - Deck
- 9.4%Excellent
- 13.0%Very good
- 23.3%Good
- 29.7%Satisfactory
- 20.6%Fair
- 4.0%Poor
- Bridge Condition - Superstructure
- 9.1%Excellent
- 12.8%Very good
- 20.5%Good
- 34.5%Satisfactory
- 19.5%Fair
- 3.5%Poor
- Bridge Condition - Substructure
- 5.9%Excellent
- 9.8%Very good
- 24.0%Good
- 39.8%Satisfactory
- 18.9%Fair
- 1.7%Poor
- Bridge Condition - Channel
- 8.6%Excellent
- 19.0%Very good
- 24.5%Good
- 30.7%Satisfactory
- 10.4%Fair
- 4.9%Poor
- 1.8%Serious
- Bridge Condition - Culverts
- 9.5%Very good
- 14.3%Good
- 47.6%Satisfactory
- 28.6%Fair
Find on map >> Show street view
Structure Number: 552120G, Location: AT RANDALLS ISLAND (Lat: 40.796889, Lng: -73.921736), Route carried "on" structure: Ramp Other road , Year Built: 1967, Year Reconstructed: 2017, Status: Open, Structure Length: 57.39m (188.29ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: RELIEF, Facility Carried by Structure: MANHATTAN TO QNS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.097, Lanes on structure: 3, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.0m (45.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 25, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 14.1m (46.3ft), Out-to-Out Width: 15.1m (49.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 57.39m (188.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $38,456,000, Roadway Improvement Cost: $22,520,000, Total Project Cost: $60,975,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552120G, Location: AT RANDALLS ISLAND (Lat: 40.796889, Lng: -73.921736), Route carried "on" structure: Ramp Other road , Year Built: 1967, Year Reconstructed: 2017, Status: Open, Structure Length: 57.39m (188.29ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: RELIEF, Facility Carried by Structure: MANHATTAN TO QNS
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.097, Lanes on structure: 3, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.0m (45.9ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 25, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 14.1m (46.3ft), Out-to-Out Width: 15.1m (49.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 42.1 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 57.39m (188.29ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $38,456,000, Roadway Improvement Cost: $22,520,000, Total Project Cost: $60,975,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552120K, Location: Manhattan (Lat: 40.800997, Lng: -73.929061), Route carried "on" structure: Ramp Interstate , Year Built: 2020, Status: Open, Structure Length: 46.63m (152.99ft), Truck Traffic: 2%, Design Load: HL 93, Features Intersected: NB HRD OFF RAMP TO E 127, Facility Carried by Structure: RFK Bridge to Harl
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Number Of Approach Spans: 5, Length of Maximum Span: 45.4m (149.0ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 83.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 46.63m (152.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: January 2021, Critical Feature Inspection Date: January 2021, Bridge Improvement Cost: $14,375,000, Roadway Improvement Cost: $8,418,000, Total Project Cost: $22,793,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Structure Number: 552120K, Location: Manhattan (Lat: 40.800997, Lng: -73.929061), Route carried "on" structure: Ramp Interstate , Year Built: 2020, Status: Open, Structure Length: 46.63m (152.99ft), Truck Traffic: 2%, Design Load: HL 93, Features Intersected: NB HRD OFF RAMP TO E 127, Facility Carried by Structure: RFK Bridge to Harl
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Number Of Approach Spans: 5, Length of Maximum Span: 45.4m (149.0ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.4m (24.3ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 83.0 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 46.63m (152.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: January 2021, Critical Feature Inspection Date: January 2021, Bridge Improvement Cost: $14,375,000, Roadway Improvement Cost: $8,418,000, Total Project Cost: $22,793,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Find on map >> Show street view
Structure Number: 5521217, Location: I278 OVER THE NARROWS (Lat: 40.609397, Lng: -74.036092), Route carried "on" structure: Interstate 278, Year Built: 1961, Status: Open, Structure Length: 235.85m (773.79ft), Average Daily Traffic: 182,700 (year 2014), Truck Traffic: 12%, Average Future Daily Traffic: 255,780 (year 2034), Design Load: HS 20+Mod, Features Intersected: RTE I278, THE NARROWS, S
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 12.421, Lanes on structure: 6, Lanes under structure: 13, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 69.4m (227.7ft), Horizontal Clearance: 609.6m (2,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 12, Length of Maximum Span: 1287.5m (4,224.1ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 22.6m (74.1ft), Out-to-Out Width: 26.8m (87.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 235.85m (773.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Underwater Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5521217, Location: I278 OVER THE NARROWS (Lat: 40.609397, Lng: -74.036092), Route carried "on" structure: Interstate 278, Year Built: 1961, Status: Open, Structure Length: 235.85m (773.79ft), Average Daily Traffic: 182,700 (year 2014), Truck Traffic: 12%, Average Future Daily Traffic: 255,780 (year 2034), Design Load: HS 20+Mod, Features Intersected: RTE I278, THE NARROWS, S
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 12.421, Lanes on structure: 6, Lanes under structure: 13, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 69.4m (227.7ft), Horizontal Clearance: 609.6m (2,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 12, Length of Maximum Span: 1287.5m (4,224.1ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 22.6m (74.1ft), Out-to-Out Width: 26.8m (87.9ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 235.85m (773.79ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Underwater Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5521218, Location: I278 OVER VERRAZ. NARROWS (Lat: 40.609300, Lng: -74.036003), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 2016, Status: Open, Structure Length: 241.28m (791.60ft), Average Daily Traffic: 162,738 (year 2020), Truck Traffic: 14%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: RTE I278, THE NARROWS
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 6, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 25.3m (83.0ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 69.4m (227.7ft), Horizontal Clearance: 609.6m (2,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 14, Length of Maximum Span: 1287.5m (4,224.1ft), Curb-To-Curb Width: 25.3m (83.0ft), Out-to-Out Width: 25.9m (85.0ft)
Condition: Deck: Very good, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 241.27m (791.57ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 5521218, Location: I278 OVER VERRAZ. NARROWS (Lat: 40.609300, Lng: -74.036003), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 2016, Status: Open, Structure Length: 241.28m (791.60ft), Average Daily Traffic: 162,738 (year 2020), Truck Traffic: 14%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: RTE I278, THE NARROWS
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 6, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 25.3m (83.0ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 69.4m (227.7ft), Horizontal Clearance: 609.6m (2,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 14, Length of Maximum Span: 1287.5m (4,224.1ft), Curb-To-Curb Width: 25.3m (83.0ft), Out-to-Out Width: 25.9m (85.0ft)
Condition: Deck: Very good, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 241.27m (791.57ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552121A, Location: I278 OVER THE NARROWS (Lat: 40.610814, Lng: -74.031944), Route carried "on" structure: Interstate 278, Year Built: 1967, Year Reconstructed: 2008, Status: Open, Structure Length: 42.98m (141.01ft), Average Daily Traffic: 202,650 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 283,710 (year 2022), Design Load: HS 20+Mod, Features Intersected: RTE I278, LEE AVE (ACCES
Minimum Vertical Clearance: 4.37m (14.34ft), Kilometerpoint: 14.272, Lanes on structure: 3, Lanes under structure: 9, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 43.2m (141.7ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 42.97m (140.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $25,235,000, Roadway Improvement Cost: $14,778,000, Total Project Cost: $40,013,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552121A, Location: I278 OVER THE NARROWS (Lat: 40.610814, Lng: -74.031944), Route carried "on" structure: Interstate 278, Year Built: 1967, Year Reconstructed: 2008, Status: Open, Structure Length: 42.98m (141.01ft), Average Daily Traffic: 202,650 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 283,710 (year 2022), Design Load: HS 20+Mod, Features Intersected: RTE I278, LEE AVE (ACCES
Minimum Vertical Clearance: 4.37m (14.34ft), Kilometerpoint: 14.272, Lanes on structure: 3, Lanes under structure: 9, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 43.2m (141.7ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 35.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 42.97m (140.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $25,235,000, Roadway Improvement Cost: $14,778,000, Total Project Cost: $40,013,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552121B, Location: I278 OVER THE NARROWS (Lat: 40.611856, Lng: -74.030256), Route carried "on" structure: Ramp Interstate 278, Year Built: 2016, Status: Open, Structure Length: 25.09m (82.32ft), Truck Traffic: 11%, Design Load: HS 25 or greater, Features Intersected: OTHER
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.064, Lanes on structure: 1, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 39.0m (128.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 65.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.08m (82.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $8,627,000, Roadway Improvement Cost: $5,052,000, Total Project Cost: $13,679,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552121B, Location: I278 OVER THE NARROWS (Lat: 40.611856, Lng: -74.030256), Route carried "on" structure: Ramp Interstate 278, Year Built: 2016, Status: Open, Structure Length: 25.09m (82.32ft), Truck Traffic: 11%, Design Load: HS 25 or greater, Features Intersected: OTHER
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.064, Lanes on structure: 1, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 39.0m (128.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Inventory Rating: 65.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.08m (82.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $8,627,000, Roadway Improvement Cost: $5,052,000, Total Project Cost: $13,679,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552121C, Location: I278 OVER THE NARROWS (Lat: 40.610675, Lng: -74.031706), Route carried "on" structure: Interstate 278, Year Built: 1967, Year Reconstructed: 2008, Status: Open, Structure Length: 46.15m (151.41ft), Average Daily Traffic: 162,738 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: RTE I278, LEE AVENUE, TO
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.869, Lanes on structure: 3, Lanes under structure: 9, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 47.5m (155.8ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Inventory Rating: 67.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 46.14m (151.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $27,472,000, Roadway Improvement Cost: $16,087,000, Total Project Cost: $43,559,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552121C, Location: I278 OVER THE NARROWS (Lat: 40.610675, Lng: -74.031706), Route carried "on" structure: Interstate 278, Year Built: 1967, Year Reconstructed: 2008, Status: Open, Structure Length: 46.15m (151.41ft), Average Daily Traffic: 162,738 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: RTE I278, LEE AVENUE, TO
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.869, Lanes on structure: 3, Lanes under structure: 9, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 47.5m (155.8ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Inventory Rating: 67.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 46.14m (151.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $27,472,000, Roadway Improvement Cost: $16,087,000, Total Project Cost: $43,559,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552121D, Location: I278 OVER THE NARROWS (Lat: 40.611581, Lng: -74.030214), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Status: Open, Structure Length: 19.39m (63.62ft), Truck Traffic: 11%, Design Load: HS 20+Mod, Features Intersected: RELIEF
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.113, Lanes on structure: 1, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 39.6m (129.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Inventory Rating: 59.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 19.38m (63.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $6,494,000, Roadway Improvement Cost: $3,803,000, Total Project Cost: $10,297,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552121D, Location: I278 OVER THE NARROWS (Lat: 40.611581, Lng: -74.030214), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Status: Open, Structure Length: 19.39m (63.62ft), Truck Traffic: 11%, Design Load: HS 20+Mod, Features Intersected: RELIEF
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.113, Lanes on structure: 1, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 39.6m (129.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Inventory Rating: 59.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 19.38m (63.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $6,494,000, Roadway Improvement Cost: $3,803,000, Total Project Cost: $10,297,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552121E, Location: I278 OVER THE NARROWS (Lat: 40.611086, Lng: -74.031414), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 1967, Status: Open, Structure Length: 66.69m (218.80ft), Average Daily Traffic: 162,738 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: I278 WESTBOUND, TO & FRO
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.869, Lanes on structure: 2, Lanes under structure: 7, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 16, Number Of Approach Spans: 23, Length of Maximum Span: 42.9m (140.7ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 66.69m (218.80ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $29,670,000, Roadway Improvement Cost: $17,375,000, Total Project Cost: $47,044,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552121E, Location: I278 OVER THE NARROWS (Lat: 40.611086, Lng: -74.031414), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 1967, Status: Open, Structure Length: 66.69m (218.80ft), Average Daily Traffic: 162,738 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: I278 WESTBOUND, TO & FRO
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.869, Lanes on structure: 2, Lanes under structure: 7, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 16, Number Of Approach Spans: 23, Length of Maximum Span: 42.9m (140.7ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 66.69m (218.80ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $29,670,000, Roadway Improvement Cost: $17,375,000, Total Project Cost: $47,044,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552121F, Location: I278 OVER THE NARROWS (Lat: 40.613697, Lng: -74.029797), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Year Reconstructed: 2012, Status: Open, Structure Length: 72.66m (238.39ft), Average Daily Traffic: 31,778 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 40,605 (year 2040), Features Intersected: WESTBOUND/EASTBOUND HOV,
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 0.724, Lanes on structure: 2, Lanes under structure: 10, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 25, Length of Maximum Span: 42.1m (138.1ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 72.66m (238.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $57,035,000, Roadway Improvement Cost: $33,400,000, Total Project Cost: $90,434,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552121F, Location: I278 OVER THE NARROWS (Lat: 40.613697, Lng: -74.029797), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Year Reconstructed: 2012, Status: Open, Structure Length: 72.66m (238.39ft), Average Daily Traffic: 31,778 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 40,605 (year 2040), Features Intersected: WESTBOUND/EASTBOUND HOV,
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 0.724, Lanes on structure: 2, Lanes under structure: 10, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 14.6m (47.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 25, Length of Maximum Span: 42.1m (138.1ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 72.66m (238.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $57,035,000, Roadway Improvement Cost: $33,400,000, Total Project Cost: $90,434,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552121G, Location: I278 OVER THE NARROWS (Lat: 40.610892, Lng: -74.031092), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 1967, Status: Open, Structure Length: 61.45m (201.61ft), Average Daily Traffic: 4,649 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 5,940 (year 2040), Features Intersected: RTE I278
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 16, Length of Maximum Span: 47.2m (154.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 61.44m (201.57ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $36,372,000, Roadway Improvement Cost: $21,299,000, Total Project Cost: $57,671,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552121G, Location: I278 OVER THE NARROWS (Lat: 40.610892, Lng: -74.031092), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 1967, Status: Open, Structure Length: 61.45m (201.61ft), Average Daily Traffic: 4,649 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 5,940 (year 2040), Features Intersected: RTE I278
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: Local Toll Authority, Approaching Roadway Width: 11.3m (37.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 16, Length of Maximum Span: 47.2m (154.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 11.3m (37.1ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 61.44m (201.57ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $36,372,000, Roadway Improvement Cost: $21,299,000, Total Project Cost: $57,671,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552121H, Location: I278 OVER THE NARROWS (Lat: 40.612131, Lng: -74.029383), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Year Reconstructed: 1967, Status: Open, Structure Length: 11.34m (37.20ft), Average Daily Traffic: 33,301 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 42,552 (year 2040), Features Intersected: RELIEF
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.290, Lanes on structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 38.7m (127.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.4m (30.8ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Testing, Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Testing, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.33m (37.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $4,463,000, Roadway Improvement Cost: $2,613,000, Total Project Cost: $7,076,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552121H, Location: I278 OVER THE NARROWS (Lat: 40.612131, Lng: -74.029383), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Year Reconstructed: 1967, Status: Open, Structure Length: 11.34m (37.20ft), Average Daily Traffic: 33,301 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 42,552 (year 2040), Features Intersected: RELIEF
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.290, Lanes on structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 38.7m (127.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.4m (30.8ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Load Testing, Inventory Rating: 27.2 metric tons, Method Used To Determine Inventory Rating: Load Testing, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.33m (37.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $4,463,000, Roadway Improvement Cost: $2,613,000, Total Project Cost: $7,076,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552121I, Location: I278 OVER THE NARROWS (Lat: 40.613339, Lng: -74.028194), Route carried "on" structure: Ramp Interstate 278, Year Built: 1965, Year Reconstructed: 1994, Status: Open, Structure Length: 14.63m (48.00ft), Average Daily Traffic: 4,649 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 5,940 (year 2040), Features Intersected: I278 TO 92ND ST.
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.338, Lanes on structure: 2, Lanes under structure: 1, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 2, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.63m (48.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $6,749,000, Roadway Improvement Cost: $3,952,000, Total Project Cost: $10,701,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 552121I, Location: I278 OVER THE NARROWS (Lat: 40.613339, Lng: -74.028194), Route carried "on" structure: Ramp Interstate 278, Year Built: 1965, Year Reconstructed: 1994, Status: Open, Structure Length: 14.63m (48.00ft), Average Daily Traffic: 4,649 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 5,940 (year 2040), Features Intersected: I278 TO 92ND ST.
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.338, Lanes on structure: 2, Lanes under structure: 1, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 2, Length of Maximum Span: 38.4m (126.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 75.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 14.63m (48.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2020, Critical Feature Inspection Date: July 2020, Bridge Improvement Cost: $6,749,000, Roadway Improvement Cost: $3,952,000, Total Project Cost: $10,701,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 552121J, Location: I278 OVER THE NARROWS (Lat: 40.610628, Lng: -74.031958), Route carried "on" structure: Interstate , Year Built: 2017, Status: Open, Structure Length: 48.28m (158.40ft), Average Daily Traffic: 33,301 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 42,552 (year 2040), Design Load: HS 25 or greater, Features Intersected: Lee Ave., 278I, 278I 278, Facility Carried by Structure: 278I
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 11, Owner: Local Toll Authority, Approaching Roadway Width: 4.6m (15.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 15, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 4.8m (15.7ft), Out-to-Out Width: 5.7m (18.7ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 48.28m (158.40ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $11,649,000, Roadway Improvement Cost: $6,822,000, Total Project Cost: $18,471,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552121J, Location: I278 OVER THE NARROWS (Lat: 40.610628, Lng: -74.031958), Route carried "on" structure: Interstate , Year Built: 2017, Status: Open, Structure Length: 48.28m (158.40ft), Average Daily Traffic: 33,301 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 42,552 (year 2040), Design Load: HS 25 or greater, Features Intersected: Lee Ave., 278I, 278I 278, Facility Carried by Structure: 278I
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 11, Owner: Local Toll Authority, Approaching Roadway Width: 4.6m (15.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 15, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 4.8m (15.7ft), Out-to-Out Width: 5.7m (18.7ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 48.28m (158.40ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $11,649,000, Roadway Improvement Cost: $6,822,000, Total Project Cost: $18,471,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5521229, Location: I678 OVER EAST RIVER (Lat: 40.797078, Lng: -73.826622), Route carried "on" structure: Interstate 678, Year Built: 1938, Year Reconstructed: 2015, Status: Open, Structure Length: 209.89m (688.62ft), Average Daily Traffic: 103,379 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 132,097 (year 2040), Design Load: HS 20, Features Intersected: 3RD AVE, HUTCHINSON RIVE
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 19.437, Lanes on structure: 6, Lanes under structure: 3, Base Highway Network: Yes, Toll: On toll road, Owner: Local Toll Authority, Approaching Roadway Width: 29.9m (98.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 306.9m (1,006.9ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 28, Length of Maximum Span: 701.0m (2,299.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 19.1m (62.7ft), Out-to-Out Width: 26.5m (86.9ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 209.88m (688.58ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Underwater Inspection Date: August 2017, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Structure Number: 5521229, Location: I678 OVER EAST RIVER (Lat: 40.797078, Lng: -73.826622), Route carried "on" structure: Interstate 678, Year Built: 1938, Year Reconstructed: 2015, Status: Open, Structure Length: 209.89m (688.62ft), Average Daily Traffic: 103,379 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 132,097 (year 2040), Design Load: HS 20, Features Intersected: 3RD AVE, HUTCHINSON RIVE
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 19.437, Lanes on structure: 6, Lanes under structure: 3, Base Highway Network: Yes, Toll: On toll road, Owner: Local Toll Authority, Approaching Roadway Width: 29.9m (98.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 306.9m (1,006.9ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 28, Length of Maximum Span: 701.0m (2,299.9ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 19.1m (62.7ft), Out-to-Out Width: 26.5m (86.9ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 209.88m (688.58ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Underwater Inspection Date: August 2017, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Find on map >> Show street view
Structure Number: 5521239, Location: CROSS BAY VETS MEM BRIDGE (Lat: 40.590442, Lng: -73.819422), Route carried "on" structure: City street 900, Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 64.07m (210.20ft), Average Daily Traffic: 16,692 (year 2011), Truck Traffic: 7%, Average Future Daily Traffic: 16,770 (year 2040), Design Load: HS 20+Mod, Features Intersected: JAMAICA BAY
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.241, Lanes on structure: 6, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 24.4m (80.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 16.1m (52.8ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 14, Length of Maximum Span: 83.8m (274.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 29.9m (98.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 64.06m (210.17ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $73,986,000, Roadway Improvement Cost: $43,326,000, Total Project Cost: $117,313,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 5521239, Location: CROSS BAY VETS MEM BRIDGE (Lat: 40.590442, Lng: -73.819422), Route carried "on" structure: City street 900, Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 64.07m (210.20ft), Average Daily Traffic: 16,692 (year 2011), Truck Traffic: 7%, Average Future Daily Traffic: 16,770 (year 2040), Design Load: HS 20+Mod, Features Intersected: JAMAICA BAY
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.241, Lanes on structure: 6, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 24.4m (80.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 16.1m (52.8ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 14, Length of Maximum Span: 83.8m (274.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 24.4m (80.1ft), Out-to-Out Width: 29.9m (98.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 64.06m (210.17ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $73,986,000, Roadway Improvement Cost: $43,326,000, Total Project Cost: $117,313,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552123A, Location: CROSS BAY BRIDGE (Lat: 40.588325, Lng: -73.817658), Route carried "on" structure: City street 900, Year Built: 1967, Year Reconstructed: 2009, Status: Open, Structure Length: 28.68m (94.09ft), Average Daily Traffic: 2,028 (year 2017), Truck Traffic: 4%, Average Future Daily Traffic: 2,037 (year 2040), Design Load: HS 20+Mod, Features Intersected: JAMAICA BAY, SEAWALL PRO
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 6, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 61.0m (200.1ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 7, Length of Maximum Span: 42.9m (140.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 0.0m, Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.6m (28.2ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Excellent, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 28.68m (94.09ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $9,191,000, Roadway Improvement Cost: $5,382,000, Total Project Cost: $14,573,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552123A, Location: CROSS BAY BRIDGE (Lat: 40.588325, Lng: -73.817658), Route carried "on" structure: City street 900, Year Built: 1967, Year Reconstructed: 2009, Status: Open, Structure Length: 28.68m (94.09ft), Average Daily Traffic: 2,028 (year 2017), Truck Traffic: 4%, Average Future Daily Traffic: 2,037 (year 2040), Design Load: HS 20+Mod, Features Intersected: JAMAICA BAY, SEAWALL PRO
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 6, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 61.0m (200.1ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 7, Length of Maximum Span: 42.9m (140.7ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 0.0m, Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.6m (28.2ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Excellent, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 28.68m (94.09ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $9,191,000, Roadway Improvement Cost: $5,382,000, Total Project Cost: $14,573,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552123B, Location: BIN 123B to 123A Span 6 (Lat: 40.588189, Lng: -73.817739), Route carried "on" structure: City street , Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 3,664 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 3,681 (year 2040), Design Load: HS 20+Mod, Features Intersected: BEACH CHANNEL DR, Facility Carried by Structure: CROSS BAY BR APPR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.177, Lanes on structure: 1, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 23.1m (75.8ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $1,208,000, Roadway Improvement Cost: $707,000, Total Project Cost: $1,916,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552123B, Location: BIN 123B to 123A Span 6 (Lat: 40.588189, Lng: -73.817739), Route carried "on" structure: City street , Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 3.23m (10.60ft), Average Daily Traffic: 3,664 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 3,681 (year 2040), Design Load: HS 20+Mod, Features Intersected: BEACH CHANNEL DR, Facility Carried by Structure: CROSS BAY BR APPR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.177, Lanes on structure: 1, Lanes under structure: 4, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 23.1m (75.8ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.23m (10.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $1,208,000, Roadway Improvement Cost: $707,000, Total Project Cost: $1,916,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552123C, Location: RAMP FROM 5521239 SPAN 1 (Lat: 40.588242, Lng: -73.818911), Route carried "on" structure: City street , Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 23.53m (77.20ft), Average Daily Traffic: 2,477 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 2,488 (year 2040), Design Load: HS 20+Mod, Features Intersected: JAMAICA BAY, Facility Carried by Structure: CROSS BAY BR ENTR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.0m (23.0ft), Skew: 2 degrees, Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Excellent, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 23.53m (77.20ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $6,982,000, Roadway Improvement Cost: $4,089,000, Total Project Cost: $11,071,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Structure Number: 552123C, Location: RAMP FROM 5521239 SPAN 1 (Lat: 40.588242, Lng: -73.818911), Route carried "on" structure: City street , Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 23.53m (77.20ft), Average Daily Traffic: 2,477 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 2,488 (year 2040), Design Load: HS 20+Mod, Features Intersected: JAMAICA BAY, Facility Carried by Structure: CROSS BAY BR ENTR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.0m (23.0ft), Skew: 2 degrees, Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Excellent, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 23.53m (77.20ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $6,982,000, Roadway Improvement Cost: $4,089,000, Total Project Cost: $11,071,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Find on map >> Show street view
Structure Number: 552123D, Location: RAMP ATTACHED TO 5521239 (Lat: 40.588022, Lng: -73.819117), Route carried "on" structure: City street 900, Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 32.19m (105.61ft), Average Daily Traffic: 2,028 (year 2017), Truck Traffic: 4%, Average Future Daily Traffic: 2,037 (year 2040), Design Load: HS 20+Mod, Features Intersected: CROSS BAY BR APPR, SEAWA
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 5, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Navigation Control: Yes ( Vertical Clearance: 16.1m (52.8ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 5, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.6m (28.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 32.18m (105.58ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $10,290,000, Roadway Improvement Cost: $6,026,000, Total Project Cost: $16,317,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552123D, Location: RAMP ATTACHED TO 5521239 (Lat: 40.588022, Lng: -73.819117), Route carried "on" structure: City street 900, Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 32.19m (105.61ft), Average Daily Traffic: 2,028 (year 2017), Truck Traffic: 4%, Average Future Daily Traffic: 2,037 (year 2040), Design Load: HS 20+Mod, Features Intersected: CROSS BAY BR APPR, SEAWA
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.483, Lanes on structure: 2, Lanes under structure: 5, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Navigation Control: Yes ( Vertical Clearance: 16.1m (52.8ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 5, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.6m (28.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 32.18m (105.58ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $10,290,000, Roadway Improvement Cost: $6,026,000, Total Project Cost: $16,317,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552123E, Location: RAMP ATTACH TO 55123D SN3 (Lat: 40.587914, Lng: -73.819339), Route carried "on" structure: City street , Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 17.56m (57.61ft), Average Daily Traffic: 3,597 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 3,613 (year 2040), Design Load: HS 20+Mod, Features Intersected: SEAWALL PROMENADE, JAMAI, Facility Carried by Structure: CROSS BAY BR EXIT
Minimum Vertical Clearance: 5.96m (19.55ft), Kilometerpoint: 0.274, Lanes on structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 2 degrees, Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 17.55m (57.58ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $5,330,000, Roadway Improvement Cost: $3,121,000, Total Project Cost: $8,451,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552123E, Location: RAMP ATTACH TO 55123D SN3 (Lat: 40.587914, Lng: -73.819339), Route carried "on" structure: City street , Year Built: 1967, Year Reconstructed: 2011, Status: Open, Structure Length: 17.56m (57.61ft), Average Daily Traffic: 3,597 (year 2016), Truck Traffic: 7%, Average Future Daily Traffic: 3,613 (year 2040), Design Load: HS 20+Mod, Features Intersected: SEAWALL PROMENADE, JAMAI, Facility Carried by Structure: CROSS BAY BR EXIT
Minimum Vertical Clearance: 5.96m (19.55ft), Kilometerpoint: 0.274, Lanes on structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 2 degrees, Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 60.9m (199.8ft)), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.0m (26.2ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 17.55m (57.58ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: September 2017, Bridge Improvement Cost: $5,330,000, Roadway Improvement Cost: $3,121,000, Total Project Cost: $8,451,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552124, Location: MARINE PKWY BR RCKWY INLT (Lat: 40.578169, Lng: -73.887756), Route carried "on" structure: City street 901, Year Built: 1936, Year Reconstructed: 2015, Status: Open, Structure Length: 121.46m (398.49ft), Average Daily Traffic: 16,268 (year 2011), Truck Traffic: 7%, Average Future Daily Traffic: 16,344 (year 2040), Design Load: HS 20, Features Intersected: ROCKAWAY INLET
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.290, Lanes on structure: 4, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 21.3m (69.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 45.7m (149.9ft), Horizontal Clearance: 152.4m (500.0ft)), Material/Design: Steel, Design/Construction: Movable - Lift, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 20, Length of Maximum Span: 164.5m (539.7ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.1m (59.4ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 121.46m (398.49ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Underwater Inspection Date: September 2021, Bridge Improvement Cost: $272,450,000, Roadway Improvement Cost: $159,547,000, Total Project Cost: $431,997,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552124, Location: MARINE PKWY BR RCKWY INLT (Lat: 40.578169, Lng: -73.887756), Route carried "on" structure: City street 901, Year Built: 1936, Year Reconstructed: 2015, Status: Open, Structure Length: 121.46m (398.49ft), Average Daily Traffic: 16,268 (year 2011), Truck Traffic: 7%, Average Future Daily Traffic: 16,344 (year 2040), Design Load: HS 20, Features Intersected: ROCKAWAY INLET
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 0.290, Lanes on structure: 4, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 21.3m (69.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 45.7m (149.9ft), Horizontal Clearance: 152.4m (500.0ft)), Material/Design: Steel, Design/Construction: Movable - Lift, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 20, Length of Maximum Span: 164.5m (539.7ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.1m (59.4ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 121.46m (398.49ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Critical Feature Inspection Date: September 2021, Underwater Inspection Date: September 2021, Bridge Improvement Cost: $272,450,000, Roadway Improvement Cost: $159,547,000, Total Project Cost: $431,997,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5521257, Location: JCT SH 9A & HARLEM RIVER (Lat: 40.878181, Lng: -73.921508), Route carried "on" structure: State highway 9A, Year Built: 1935, Year Reconstructed: 2020, Status: Open, Structure Length: 57.18m (187.60ft), Average Daily Traffic: 67,364 (year 2019), Truck Traffic: 1%, Average Future Daily Traffic: 83,059 (year 2040), Design Load: HS 20, Features Intersected: Edsall Avenue, Palisade
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.000, Lanes on structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Navigation Control: Yes ( Vertical Clearance: 43.5m (142.7ft), Horizontal Clearance: 107.5m (352.7ft)), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 30, Length of Maximum Span: 256.0m (839.9ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 15.2m (49.9ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 57.18m (187.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $86,529,000, Roadway Improvement Cost: $50,671,000, Total Project Cost: $137,200,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5521257, Location: JCT SH 9A & HARLEM RIVER (Lat: 40.878181, Lng: -73.921508), Route carried "on" structure: State highway 9A, Year Built: 1935, Year Reconstructed: 2020, Status: Open, Structure Length: 57.18m (187.60ft), Average Daily Traffic: 67,364 (year 2019), Truck Traffic: 1%, Average Future Daily Traffic: 83,059 (year 2040), Design Load: HS 20, Features Intersected: Edsall Avenue, Palisade
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.000, Lanes on structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Navigation Control: Yes ( Vertical Clearance: 43.5m (142.7ft), Horizontal Clearance: 107.5m (352.7ft)), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 30, Length of Maximum Span: 256.0m (839.9ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 15.2m (49.9ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 50.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 57.18m (187.60ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $86,529,000, Roadway Improvement Cost: $50,671,000, Total Project Cost: $137,200,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5521258, Location: SH 9A & SPUYTEN DUYVIL CK (Lat: 40.878342, Lng: -73.921369), Route carried "on" structure: State highway 9A, Year Built: 1937, Year Reconstructed: 2020, Status: Open, Structure Length: 73.43m (240.91ft), Average Daily Traffic: 67,364 (year 2019), Truck Traffic: 1%, Average Future Daily Traffic: 83,059 (year 2040), Design Load: H 20, Features Intersected: Henry Hudson Parkway Sou
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.6m (38.1ft), Skew: 3 degrees, Navigation Control: Yes ( Vertical Clearance: 43.5m (142.7ft), Horizontal Clearance: 107.5m (352.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 69, Length of Maximum Span: 32.9m (107.9ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 15.7m (51.5ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 73.42m (240.88ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $50,971,000, Roadway Improvement Cost: $29,849,000, Total Project Cost: $80,820,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 5521258, Location: SH 9A & SPUYTEN DUYVIL CK (Lat: 40.878342, Lng: -73.921369), Route carried "on" structure: State highway 9A, Year Built: 1937, Year Reconstructed: 2020, Status: Open, Structure Length: 73.43m (240.91ft), Average Daily Traffic: 67,364 (year 2019), Truck Traffic: 1%, Average Future Daily Traffic: 83,059 (year 2040), Design Load: H 20, Features Intersected: Henry Hudson Parkway Sou
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 11.6m (38.1ft), Skew: 3 degrees, Navigation Control: Yes ( Vertical Clearance: 43.5m (142.7ft), Horizontal Clearance: 107.5m (352.7ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 69, Length of Maximum Span: 32.9m (107.9ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 15.7m (51.5ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 22.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 73.42m (240.88ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $50,971,000, Roadway Improvement Cost: $29,849,000, Total Project Cost: $80,820,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5521269, Location: 295I OVER EAST RIVER (Lat: 40.804664, Lng: -73.793731), Route carried "on" structure: Interstate 295, Year Built: 1961, Year Reconstructed: 2011, Status: Open, Structure Length: 342.90m (1125.00ft), Average Daily Traffic: 96,975 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 123,914 (year 2040), Features Intersected: Cross Island Parkway (Ro
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 5, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 24.8m (81.4ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 43.2m (141.7ft), Horizontal Clearance: 304.8m (1,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 57, Length of Maximum Span: 548.6m (1,799.9ft), Curb-To-Curb Width: 24.8m (81.4ft), Out-to-Out Width: 26.4m (86.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 342.90m (1125.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Underwater Inspection Date: October 2017, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Structure Number: 5521269, Location: 295I OVER EAST RIVER (Lat: 40.804664, Lng: -73.793731), Route carried "on" structure: Interstate 295, Year Built: 1961, Year Reconstructed: 2011, Status: Open, Structure Length: 342.90m (1125.00ft), Average Daily Traffic: 96,975 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 123,914 (year 2040), Features Intersected: Cross Island Parkway (Ro
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 5, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 24.8m (81.4ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 43.2m (141.7ft), Horizontal Clearance: 304.8m (1,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 57, Length of Maximum Span: 548.6m (1,799.9ft), Curb-To-Curb Width: 24.8m (81.4ft), Out-to-Out Width: 26.4m (86.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 26.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 342.90m (1125.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Underwater Inspection Date: October 2017, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Find on map >> Show street view
Structure Number: 552126A, Location: I295 OVER EAST RIVER (Lat: 40.788928, Lng: -73.789847), Route carried "on" structure: Ramp Interstate , Year Built: 1961, Year Reconstructed: 1995, Status: Open, Structure Length: 24.32m (79.79ft), Average Daily Traffic: 25,570 (year 2016), Truck Traffic: 11%, Average Future Daily Traffic: 32,673 (year 2040), Design Load: HS 20, Features Intersected: CIP SERVICE ROAD, Facility Carried by Structure: CRS ISLND PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.386, Lanes on structure: 2, Lanes under structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 34.1m (111.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.3m (30.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Very good, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 24.32m (79.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $9,592,000, Roadway Improvement Cost: $5,617,000, Total Project Cost: $15,208,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552126A, Location: I295 OVER EAST RIVER (Lat: 40.788928, Lng: -73.789847), Route carried "on" structure: Ramp Interstate , Year Built: 1961, Year Reconstructed: 1995, Status: Open, Structure Length: 24.32m (79.79ft), Average Daily Traffic: 25,570 (year 2016), Truck Traffic: 11%, Average Future Daily Traffic: 32,673 (year 2040), Design Load: HS 20, Features Intersected: CIP SERVICE ROAD, Facility Carried by Structure: CRS ISLND PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.386, Lanes on structure: 2, Lanes under structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 34.1m (111.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.3m (30.5ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Very good, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 24.32m (79.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $9,592,000, Roadway Improvement Cost: $5,617,000, Total Project Cost: $15,208,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 552126B, Location: I295 OVER EAST RIVER (Lat: 40.788269, Lng: -73.790569), Route carried "on" structure: Ramp Interstate 295, Year Built: 1961, Year Reconstructed: 1995, Status: Open, Structure Length: 33.65m (110.40ft), Average Daily Traffic: 103,688 (year 2020), Truck Traffic: 17%, Average Future Daily Traffic: 132,492 (year 2040), Design Load: HS 20, Features Intersected: Cross Island Boulevard,
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 7.884, Lanes on structure: 2, Lanes under structure: 7, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 304.8m (1,000.0ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 41.1m (134.8ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.3m (30.5ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Very good, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 33.64m (110.37ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: August 2017, Bridge Improvement Cost: $13,428,000, Roadway Improvement Cost: $7,864,000, Total Project Cost: $21,292,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552126B, Location: I295 OVER EAST RIVER (Lat: 40.788269, Lng: -73.790569), Route carried "on" structure: Ramp Interstate 295, Year Built: 1961, Year Reconstructed: 1995, Status: Open, Structure Length: 33.65m (110.40ft), Average Daily Traffic: 103,688 (year 2020), Truck Traffic: 17%, Average Future Daily Traffic: 132,492 (year 2040), Design Load: HS 20, Features Intersected: Cross Island Boulevard,
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 7.884, Lanes on structure: 2, Lanes under structure: 7, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 304.8m (1,000.0ft)), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 12, Length of Maximum Span: 41.1m (134.8ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.3m (30.5ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Very good, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 33.64m (110.37ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: September 2021, Underwater Inspection Date: August 2017, Bridge Improvement Cost: $13,428,000, Roadway Improvement Cost: $7,864,000, Total Project Cost: $21,292,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 5521889, Location: I278 OVER HELLGATE (Lat: 40.798833, Lng: -73.919189), Route carried "on" structure: Interstate 278, Year Built: 1936, Year Reconstructed: 2018, Status: Open, Structure Length: 399.59m (1310.99ft), Average Daily Traffic: 108,134 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 138,173 (year 2040), Design Load: HS 20, Features Intersected: City Streets, EAST RIVER
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 39, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 32.9m (107.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 42.9m (140.7ft), Horizontal Clearance: 243.8m (799.9ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 139, Length of Maximum Span: 420.6m (1,379.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 27.6m (90.6ft), Out-to-Out Width: 29.9m (98.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 399.59m (1310.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 5521889, Location: I278 OVER HELLGATE (Lat: 40.798833, Lng: -73.919189), Route carried "on" structure: Interstate 278, Year Built: 1936, Year Reconstructed: 2018, Status: Open, Structure Length: 399.59m (1310.99ft), Average Daily Traffic: 108,134 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 138,173 (year 2040), Design Load: HS 20, Features Intersected: City Streets, EAST RIVER
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 39, Base Highway Network: Yes, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 32.9m (107.9ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 42.9m (140.7ft), Horizontal Clearance: 243.8m (799.9ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 139, Length of Maximum Span: 420.6m (1,379.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 27.6m (90.6ft), Out-to-Out Width: 29.9m (98.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 399.59m (1310.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552188A, Location: I278 OVER HELLGATE (Lat: 40.795808, Lng: -73.920436), Route carried "on" structure: Ramp Other road , Year Built: 1936, Year Reconstructed: 2016, Status: Open, Structure Length: 81.69m (268.01ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: ISLAND ACCESS RD, 278I X, Facility Carried by Structure: QUEENS TO MANHTTN
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.016, Lanes on structure: 2, Lanes under structure: 12, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 19, Number Of Approach Spans: 32, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 10.2m (33.5ft), Out-to-Out Width: 13.6m (44.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 81.68m (267.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $41,897,000, Roadway Improvement Cost: $24,535,000, Total Project Cost: $66,432,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Structure Number: 552188A, Location: I278 OVER HELLGATE (Lat: 40.795808, Lng: -73.920436), Route carried "on" structure: Ramp Other road , Year Built: 1936, Year Reconstructed: 2016, Status: Open, Structure Length: 81.69m (268.01ft), Truck Traffic: 11%, Design Load: HS 20, Features Intersected: ISLAND ACCESS RD, 278I X, Facility Carried by Structure: QUEENS TO MANHTTN
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.016, Lanes on structure: 2, Lanes under structure: 12, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 19, Number Of Approach Spans: 32, Length of Maximum Span: 27.7m (90.9ft), Curb-To-Curb Width: 10.2m (33.5ft), Out-to-Out Width: 13.6m (44.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 81.68m (267.98ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $41,897,000, Roadway Improvement Cost: $24,535,000, Total Project Cost: $66,432,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Galvanized Reinforcing
Find on map >> Show street view
Structure Number: 552188B, Location: 278I BRONX TO MANHATTAN (Lat: 40.797450, Lng: -73.920614), Route carried "on" structure: Ramp Other road 278, Year Built: 2001, Status: Open, Structure Length: 11.06m (36.29ft), Truck Traffic: 11%, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.064, Lanes on structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 19.5m (64.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 11.06m (36.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $7,458,000, Roadway Improvement Cost: $4,368,000, Total Project Cost: $11,826,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 552188B, Location: 278I BRONX TO MANHATTAN (Lat: 40.797450, Lng: -73.920614), Route carried "on" structure: Ramp Other road 278, Year Built: 2001, Status: Open, Structure Length: 11.06m (36.29ft), Truck Traffic: 11%, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.064, Lanes on structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 19.5m (64.0ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.8m (45.3ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 11.06m (36.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $7,458,000, Roadway Improvement Cost: $4,368,000, Total Project Cost: $11,826,000 ( Estimate for 2021), Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 552188C, Location: RFK Exit Ramp BW (Lat: 40.787431, Lng: -73.929103), Route carried "on" structure: Ramp Other road , Year Built: 2007, Status: Open, Structure Length: 36.88m (121.00ft), Average Daily Traffic: 154,800 (year 2011), Average Future Daily Traffic: 216,720 (year 2031), Design Load: HS 25 or greater, Features Intersected: Sunken Garden Loop, Ward, Facility Carried by Structure: RFK Exit Ramp BW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 13, Length of Maximum Span: 31.1m (102.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.9m (29.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 36.88m (121.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $14,171,000, Roadway Improvement Cost: $8,298,000, Total Project Cost: $22,469,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 552188C, Location: RFK Exit Ramp BW (Lat: 40.787431, Lng: -73.929103), Route carried "on" structure: Ramp Other road , Year Built: 2007, Status: Open, Structure Length: 36.88m (121.00ft), Average Daily Traffic: 154,800 (year 2011), Average Future Daily Traffic: 216,720 (year 2031), Design Load: HS 25 or greater, Features Intersected: Sunken Garden Loop, Ward, Facility Carried by Structure: RFK Exit Ramp BW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 13, Length of Maximum Span: 31.1m (102.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.9m (29.2ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 36.88m (121.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $14,171,000, Roadway Improvement Cost: $8,298,000, Total Project Cost: $22,469,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 55219, Location: AT JCT I278 & BSHP (Lat: 40.609550, Lng: -74.035050), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Status: Open, Structure Length: 21.03m (69.00ft), Average Daily Traffic: 129,222 (year 2018), Truck Traffic: 8%, Average Future Daily Traffic: 165,119 (year 2040), Design Load: HS 20+Mod, Features Intersected: 907CX WEST BOUND, RTE 90
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.644, Lanes on structure: 2, Lanes under structure: 6, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 8, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.4m (30.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.03m (69.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $8,686,000, Roadway Improvement Cost: $5,086,000, Total Project Cost: $13,772,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 55219, Location: AT JCT I278 & BSHP (Lat: 40.609550, Lng: -74.035050), Route carried "on" structure: Ramp Interstate 278, Year Built: 1961, Status: Open, Structure Length: 21.03m (69.00ft), Average Daily Traffic: 129,222 (year 2018), Truck Traffic: 8%, Average Future Daily Traffic: 165,119 (year 2040), Design Load: HS 20+Mod, Features Intersected: 907CX WEST BOUND, RTE 90
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.644, Lanes on structure: 2, Lanes under structure: 6, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 8, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.4m (30.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.03m (69.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $8,686,000, Roadway Improvement Cost: $5,086,000, Total Project Cost: $13,772,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552191, Location: AT JCT I278 & BSHP (Lat: 40.608758, Lng: -74.034408), Route carried "on" structure: Ramp State highway 907C, Year Built: 1961, Year Reconstructed: 2009, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 33,301 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 42,552 (year 2040), Design Load: HS 20+Mod, Features Intersected: PUMP HOUSE ACCESS ROAD
Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 1.223, Lanes on structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.6m (34.8ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.21m (3.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $964,000, Total Project Cost: $2,610,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 552191, Location: AT JCT I278 & BSHP (Lat: 40.608758, Lng: -74.034408), Route carried "on" structure: Ramp State highway 907C, Year Built: 1961, Year Reconstructed: 2009, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 33,301 (year 2020), Truck Traffic: 11%, Average Future Daily Traffic: 42,552 (year 2040), Design Load: HS 20+Mod, Features Intersected: PUMP HOUSE ACCESS ROAD
Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 1.223, Lanes on structure: 2, Toll: Toll bridge, Owner: Local Toll Authority, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.6m (34.8ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 7.6m (24.9ft), Out-to-Out Width: 9.8m (32.2ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.21m (3.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2020, Bridge Improvement Cost: $1,646,000, Roadway Improvement Cost: $964,000, Total Project Cost: $2,610,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 5521929, Location: W OF I278 & THE NARROWS (Lat: 40.603031, Lng: -74.065528), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 2008, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 162,738 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: LILY POND AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.470, Lanes on structure: 17, Lanes under structure: 5, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 126.5m (415.0ft), Skew: 23 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 126.5m (415.0ft), Out-to-Out Width: 129.5m (424.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $40,059,000, Roadway Improvement Cost: $23,458,000, Total Project Cost: $63,517,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 5521929, Location: W OF I278 & THE NARROWS (Lat: 40.603031, Lng: -74.065528), Route carried "on" structure: Interstate 278, Year Built: 1961, Year Reconstructed: 2008, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 162,738 (year 2011), Truck Traffic: 11%, Average Future Daily Traffic: 207,946 (year 2040), Design Load: HS 20+Mod, Features Intersected: LILY POND AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.470, Lanes on structure: 17, Lanes under structure: 5, Base Highway Network: Yes, Owner: Local Toll Authority, Approaching Roadway Width: 126.5m (415.0ft), Skew: 23 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 126.5m (415.0ft), Out-to-Out Width: 129.5m (424.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2020, Bridge Improvement Cost: $40,059,000, Roadway Improvement Cost: $23,458,000, Total Project Cost: $63,517,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete