Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,992Number of bridges
  • 68,865ft / 20,990mTotal length
  • $41,847,025,000Total costs
  • 106,047,317Total average daily traffic
  • 3,057,321Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New York
  • No street view available for this location

New bridges in New York, NY - historical statistics
  • New bridges - historical statistics
  • 47Before 1900
  • 1961900-1909
  • 1711910-1919
  • 1241920-1929
  • 3951930-1939
  • 2541940-1949
  • 4641950-1959
  • 7351960-1969
  • 1551970-1979
  • 881980-1989
  • 731990-1999
  • 1432000-2009
  • 1242010-2019
  • 232020-2022
Reconstructed bridges in New York, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 121930-1939
  • 01940-1949
  • 71950-1959
  • 81960-1969
  • 491970-1979
  • 1441980-1989
  • 1731990-1999
  • 982000-2009
  • 652010-2019
  • 52020-2022
Average Bridge Daily Traffic in New York, NY
Average Bridge Truck Traffic in New York, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 13.0%Very good
  • 23.3%Good
  • 29.7%Satisfactory
  • 20.6%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 12.8%Very good
  • 20.5%Good
  • 34.5%Satisfactory
  • 19.5%Fair
  • 3.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 9.8%Very good
  • 24.0%Good
  • 39.8%Satisfactory
  • 18.9%Fair
  • 1.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.6%Excellent
  • 19.0%Very good
  • 24.5%Good
  • 30.7%Satisfactory
  • 10.4%Fair
  • 4.9%Poor
  • 1.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 14.3%Good
  • 47.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 107651,  Location: .6 MI SW GCP+CRS ISL PKWY (Lat: 40.738583,  Lng: -73.739358),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1971,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 3,440 (year 2009),  Average Future Daily Traffic: 4,816 (year 2029),  Design Load: HS 20,  Features Intersected: MOTOR PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,481,000,  Roadway Improvement Cost: $867,000,  Total Project Cost: $2,348,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1076529,  Location: .6 MI SW JCT GCP &CI PKWY (Lat: 40.738814,  Lng: -73.739767),  Route carried "on" structure: City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 135,238 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 166,748 (year 2040),  Design Load: HS 20,  Features Intersected: MOTOR PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.080,  Lanes on structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 31.6m (103.7ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 39.5m (129.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $8,784,000,  Roadway Improvement Cost: $5,144,000,  Total Project Cost: $13,928,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107653,  Location: .6 MI SW GCP+CRS ISL PKWY (Lat: 40.739042,  Lng: -73.740156),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1971,  Status: Open,  Structure Length: 2.95m (9.68ft),  Average Daily Traffic: 1,280 (year 2009),  Average Future Daily Traffic: 1,792 (year 2029),  Design Load: HS 20,  Features Intersected: MOTOR PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,809,000,  Roadway Improvement Cost: $1,059,000,  Total Project Cost: $2,868,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107654,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.742400,  Lng: -73.734494),  Route carried "on" structure: Ramp City street ,  Year Built: 1971,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 8,040 (year 2009),  Average Future Daily Traffic: 11,256 (year 2029),  Design Load: HS 20,  Features Intersected: RTE 907A, ALLEY PARK ROA,  Facility Carried by Structure: RAMP TO 907A NB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,605,000,  Roadway Improvement Cost: $940,000,  Total Project Cost: $2,545,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107655,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.741900,  Lng: -73.736364),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 7,681 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,470 (year 2040),  Design Load: H 20,  Features Intersected: ALLEY PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,551,000,  Roadway Improvement Cost: $2,079,000,  Total Project Cost: $5,630,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107656,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.743128,  Lng: -73.734928),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 3,215 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,964 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,093,000,  Roadway Improvement Cost: $1,811,000,  Total Project Cost: $4,904,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107657,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.742367,  Lng: -73.733414),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 17,360 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 21,404 (year 2040),  Design Load: H 20,  Features Intersected: WINCHESTER BLVD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,373,000,  Roadway Improvement Cost: $4,318,000,  Total Project Cost: $11,690,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107658,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.742478,  Lng: -73.733472),  Route carried "on" structure: Ramp City street 907A,  Year Built: 1971,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 12,091 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,908 (year 2040),  Design Load: HS 20,  Features Intersected: WINCHESTER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,293,000,  Roadway Improvement Cost: $1,343,000,  Total Project Cost: $3,635,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107659,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.743656,  Lng: -73.734325),  Route carried "on" structure: ServiceCity street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 3,215 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,964 (year 2040),  Design Load: H 20,  Features Intersected: WINCHESTER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,915,000,  Roadway Improvement Cost: $2,293,000,  Total Project Cost: $6,207,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10766,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.743550,  Lng: -73.731831),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 12,091 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,908 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A, RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,126,000,  Roadway Improvement Cost: $2,416,000,  Total Project Cost: $6,542,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107661,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.744253,  Lng: -73.733392),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 13,511 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,659 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $2,996,000,  Roadway Improvement Cost: $1,755,000,  Total Project Cost: $4,751,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107662,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.743867,  Lng: -73.732403),  Route carried "on" structure: Ramp City street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 2.37m (7.78ft),  Average Daily Traffic: 13,511 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,659 (year 2040),  Design Load: H 20,  Features Intersected: RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,038,000,  Roadway Improvement Cost: $1,779,000,  Total Project Cost: $4,818,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107663,  Location: JCT GCP+CROSS ISLAND PKWY (Lat: 40.744786,  Lng: -73.730792),  Route carried "on" structure: ServiceCity street 907M,  Year Built: 1972,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 15,004 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,499 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $1,720,000,  Roadway Improvement Cost: $1,007,000,  Total Project Cost: $2,728,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107665,  Location: 1.1 MI W I678 & SH 27 (Lat: 40.664542,  Lng: -73.822744),  Route carried "on" structure: City street ,  Year Built: 1967,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 15,020 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,090 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907D, RAMP TO EB 907,  Facility Carried by Structure: LEFFERTS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 6,  Lanes under structure: 11,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $12,019,000,  Roadway Improvement Cost: $7,038,000,  Total Project Cost: $19,057,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107666,  Location: .7 MI W JCT I678 & SH 27 (Lat: 40.666317,  Lng: -73.789500),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 11,556 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,610 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907D, RTE 907D,  Facility Carried by Structure: 150TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,261,000,  Roadway Improvement Cost: $2,495,000,  Total Project Cost: $6,756,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1076679,  Location: .6 MI E I278+GCP (Lat: 40.766422,  Lng: -73.893928),  Route carried "on" structure: State highway 907M,  Year Built: 1963,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 99,202 (year 2008),  Truck Traffic: 2%,  Average Future Daily Traffic: 122,316 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.301,  Lanes on structure: 12,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 53.3m (174.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 54.9m (180.1ft),  Out-to-Out Width: 91.4m (299.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $16,745,000,  Roadway Improvement Cost: $9,806,000,  Total Project Cost: $26,551,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107668,  Location: JCT I95+BRONX RIVER PKWY (Lat: 40.835967,  Lng: -73.873797),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 4,015 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,878 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 907H, RTE 907H,  Facility Carried by Structure: CBE SERVICE RD EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 4.1m (13.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,265,000,  Roadway Improvement Cost: $2,497,000,  Total Project Cost: $6,762,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107669,  Location: .9 MI S JCT I95 & I895 (Lat: 40.827600,  Lng: -73.885614),  Route carried "on" structure: Ramp Interstate 895,  Year Built: 1964,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 18.14m (59.51ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: SLOPE ADJ TO RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.13m (59.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $6,234,000,  Roadway Improvement Cost: $3,651,000,  Total Project Cost: $9,884,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10767,  Location: JCT G C PKWY & I495 (Lat: 40.740161,  Lng: -73.845672),  Route carried "on" structure: ServiceInterstate 495,  Year Built: 1963,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 48,097 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 61,458 (year 2040),  Design Load: HL 93,  Features Intersected: RTE 907M, RTE 907M, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 3,  Lanes under structure: 13,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $7,210,000,  Roadway Improvement Cost: $4,222,000,  Total Project Cost: $11,433,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 107671,  Location: JCT GCP+I495 (Lat: 40.739769,  Lng: -73.845361),  Route carried "on" structure: ServiceInterstate 495,  Year Built: 1963,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 48,728 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 62,264 (year 2040),  Design Load: HL 93,  Features Intersected: RTE 907M, RTE 907, RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 3,  Lanes under structure: 13,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $7,014,000,  Roadway Improvement Cost: $4,107,000,  Total Project Cost: $11,122,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1076729,  Location: .1 MILE N JCT I95 & BRP (Lat: 40.838469,  Lng: -73.873172),  Route carried "on" structure: State highway 907H,  Year Built: 1951,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 99,928 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 123,211 (year 2040),  Design Load: H 20,  Features Intersected: AMTRAK/CSXT/P&W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $10,070,000,  Roadway Improvement Cost: $5,897,000,  Total Project Cost: $15,967,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107673,  Location: JCT GCP+ROUTE 678 (Lat: 40.715611,  Lng: -73.826064),  Route carried "on" structure: Ramp City street 908B,  Year Built: 1963,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 23,540 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 30,079 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I678, RTE I678, RTE
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,882,000,  Roadway Improvement Cost: $1,102,000,  Total Project Cost: $2,983,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107674,  Location: JCT I 278 & I 27 (Lat: 40.666458,  Lng: -73.995919),  Route carried "on" structure: Interstate 278,  Year Built: 1963,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 168,944 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 215,876 (year 2040),  Design Load: HS 20,  Features Intersected: 17TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.640,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,276,000,  Roadway Improvement Cost: $1,918,000,  Total Project Cost: $5,194,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107675,  Location: JCT I278 & SH 27 (Lat: 40.666575,  Lng: -73.996181),  Route carried "on" structure: Ramp City street 27,  Year Built: 1955,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 175,362 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 245,507 (year 2034),  Features Intersected: 17TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.0m,  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,281,000,  Roadway Improvement Cost: $750,000,  Total Project Cost: $2,032,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1076767,  Location: .4 MI S GCP+I678 (Lat: 40.752747,  Lng: -73.851900),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 13,008 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,069 (year 2040),  Features Intersected: 907X907MX5MI4050, RTE 90,  Facility Carried by Structure: ROOSEVELT AVE
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 5.583,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 4.0m (13.1ft),  Right: 4.0m (13.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,407,000,  Roadway Improvement Cost: $2,581,000,  Total Project Cost: $6,988,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107678,  Location: 2.5 MI N JCT I87 & I95 (Lat: 40.876942,  Lng: -73.904547),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1955,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 4.60m (15.09ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,195,000,  Roadway Improvement Cost: $1,286,000,  Total Project Cost: $3,481,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107679,  Location: 2.4 MI N JCT I87 & I95 (Lat: 40.876189,  Lng: -73.904844),  Route carried "on" structure: Ramp Interstate 87,  Year Built: 1955,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 4.60m (15.09ft),  Truck Traffic: 3%,  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,195,000,  Roadway Improvement Cost: $1,286,000,  Total Project Cost: $3,481,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1076839,  Location: 2.4 MILES S JCT I87 & I95 (Lat: 40.810156,  Lng: -73.930186),  Route carried "on" structure: Interstate 87,  Year Built: 1960,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 98,677 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 126,089 (year 2040),  Design Load: HS 20,  Features Intersected: RIDER AVE PED TNL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 25.9m (85.0ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,656,000,  Roadway Improvement Cost: $1,555,000,  Total Project Cost: $4,211,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1076849,  Location: JCT I278 & RTE 27 (Lat: 40.666903,  Lng: -73.995678),  Route carried "on" structure: Ramp City street 27,  Year Built: 1940,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.52m (4.99ft),  Truck Traffic: 11%,  Design Load: HS 25 or greater,  Features Intersected: RTE 27
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,526,000,  Roadway Improvement Cost: $894,000,  Total Project Cost: $2,420,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1076851,  Location: JCT I278 & 27 (Lat: 40.666975,  Lng: -73.995364),  Route carried "on" structure: Ramp City street 27,  Year Built: 1997,  Status: Open,  Structure Length: 2.23m (7.32ft),  Truck Traffic: 11%,  Design Load: HS 25 or greater,  Features Intersected: RTE 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,756,000,  Roadway Improvement Cost: $1,614,000,  Total Project Cost: $4,370,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1076852,  Location: JCT I278 & 27 (Lat: 40.667000,  Lng: -73.995228),  Route carried "on" structure: Ramp City street 27,  Year Built: 1997,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 9,962 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,282 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,038,000,  Roadway Improvement Cost: $1,193,000,  Total Project Cost: $3,231,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1076879,  Location: SW OF YANKEE STADIUM (Lat: 40.826469,  Lng: -73.930819),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 6,947 (year 1996),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,726 (year 2016),  Design Load: HS 25 or greater,  Features Intersected: 87I 87IXM11014, METRO NO,  Facility Carried by Structure: EXTERIOR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.4m (142.4ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 8.44m (27.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,977,000,  Roadway Improvement Cost: $2,915,000,  Total Project Cost: $7,892,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10769,  Location: JCT I 278 & I 478 (Lat: 40.680622,  Lng: -74.003158),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Truck Traffic: 10%,  Features Intersected: RTE I278,  Facility Carried by Structure: RAPELYE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 4.9m (16.1ft),  Right: 4.9m (16.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,255,000,  Roadway Improvement Cost: $1,320,000,  Total Project Cost: $3,575,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107691,  Location: JCT I 278 & I 478 (Lat: 40.681228,  Lng: -74.002567),  Route carried "on" structure: City street ,  Year Built: 1946,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 311 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 435 (year 2039),  Features Intersected: RTE I278,  Facility Carried by Structure: WOODHULL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 4.7m (15.4ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $3,702,000,  Roadway Improvement Cost: $2,168,000,  Total Project Cost: $5,869,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107693,  Location: JCT I87+I95 (Lat: 40.846022,  Lng: -73.930928),  Route carried "on" structure: Ramp City street ,  Year Built: 1961,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 5,409 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,911 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I95,  Facility Carried by Structure: RAMPS TO/FROM HRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 12.80m (41.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,501,000,  Roadway Improvement Cost: $4,393,000,  Total Project Cost: $11,894,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107694,  Location: JCT I87+I95 (Lat: 40.845792,  Lng: -73.930994),  Route carried "on" structure: Ramp City street ,  Year Built: 1961,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 18,737 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 23,942 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP TO 95I & 87I,  Facility Carried by Structure: RAMP TO HRD SB
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.3m (102.7ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 9.72m (31.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $5,305,000,  Roadway Improvement Cost: $3,107,000,  Total Project Cost: $8,411,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 107694A,  Location: JCT I87+I95 (Lat: 40.845975,  Lng: -73.931581),  Route carried "on" structure: Ramp City street ,  Year Built: 1961,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 8,976 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,469 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP TO 95I & 87I,  Facility Carried by Structure: RAMP TO US 1
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,564,000,  Roadway Improvement Cost: $916,000,  Total Project Cost: $2,480,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other